Shows that this positive value is that the implementation of the work has accelerated or has not experienced delays, and the performance of the project implementation is better and faster following the initial planning. On the schedule variance graph (SV), the implementation of this project is all positive. In this descriptive analysis, which was carried out at the Mapolres Mapolres Advanced Building Project, the aim was to determine the time performance and find solutions to problems that existed in the implementation of this project. This research uses quantitative descriptive analysis research. In every construction project implementation, the main factor that makes the project successful or not is in terms of both time and cost. This is followed by the development of a very diverse method of various construction implementations applied in the process. Looking at the total level of rapid development of construction work, which is relatively fast, it becomes a challenge for the construction world. Project, Result Value, Time Performance Abstract